Call us on 01782 411611

On site assembly

On site assembly

Overview

A customer approached MCL to manufacture and install a housing 14.8m W x 5.7m D x 3.5m C.I.H. The scope of the project was manufacture, delivery in flat pack, erect on site (providing all relevant Health and Safety documentation) and equip with electrics. Site assembly was carried out by the MCL Installation Team who hold the following certifications: - SSSTS Supervisor; CSCS Operators; Clean Water Hygiene Cards; Working at Height. All ventilation and heating calculations were undertaken by MCL utilising the data provided by the customer.

Gallery

Quote